|
Object prior to the beginning of an accomplishment


Preparation, to fill with rubble


Alignment of strip - condensation of rubble by rammer

Tiles “Old city” after1 year stacking




Accomplishment of strip near the house, a path


|
|
Âèä
|
The name
|
|

|
" " BORDER STONE " (vibrocast / drypressed)
Size - 50.0 : 23.0 sm
Thickness of 4,5 sm / 6,5 sm 2 pieces/1 l.m.
Weight = 16 kg/piece
|
|

|
"DRAIN
"
vibrocast / drypressed
Size - 35,0õ16,0õ6,0
26,0õ16,0õ8,0
3 è 4 pieces/1m
|
|

|
"Drain with a lattice
" vibrocast / drypressed
Âîäîñòîê 500õ170õ150
Ðåøåòêà 500õ125
|
|

|
CLOVER smooth/ shagreen
vibrocast
Size - 26,7 : 21,8 sm
Thickness of 4,5 sm/6 sm.
28 pieces/1m
Weight = 81,2 kg/piece
|
|

|
"Rhombus
" vibrocast / drypressed
Size 19õ32 sm
Thickness of 4,5 sm
32 pieces/1m
Weight = 96 kg/piece.
|
|

|
COVER
, Weight = 20 kg. vibrocast / drypressed
Size 50õ50õ7 sm
|
|

|
PARAPET
, Weight 14 kg. vibrocast / drypressed
Size 39õ27õ6 sm
|
|

|
" Road brick / Stone blocks
vibrocast / drypressed
Size 10,0: 20,0 sm
Thickness of 4,5/6 sm
50 pieces/1m
Weight = 100 kg/piece
|
|

|
“Fragmentary stone” facing
vibrocast / drypressed
Size 26,7 : 12,5 sm
Thickness of 2,0 sm
30 pieces/1m
Weight = 33 kg/piece
|
|

|
“Square” / shagreen
vibrocast / drypressed
Size 30,0:30,0 sm
Thickness of 3,0 sm
11 pieces/1m
|
|

|
" “Square”
" vibrocast / drypressed
Size 40:40 sm
Thickness of 5 ñì/6 sm
6,25 pieces/1 m
Weight 24 kg/1 piece
|
|

|
Double "Ò"
Size 22,5 : 8,8 sm
Thickness of 4,5/6,0 sm
40 øò/ êâ ì
Weight = 117,2 kg/piece
|
|

|
“RETRO OF THE BRICK 1/2”
Size 11,72 11,7 sm
Thickness of 5 sm
68 pieces/1m ; Âåñ:102 kg/piece
|
|

|
“RETRO PYRAMID”
Size 5õ13õL11,7
Thickness of 5 sm
69 pieces/1m
Weight 102 kg/piece
|
|

|
“RETRO SQUARE”
Size 24,2õ24,2 sm
Thickness of 5 sm
17 pieces/1m
Weight 102 kg/piece
|
|

|
“RETRO BRICK”
Size 24,2õ11,5 sm
Thickness of 5 sm
34 pieces/1m
Weight 102 kg/piece
|
|
Process of stacking of the tile

Preparation of a surface for stacking of pavement tiles.
Pavement plates (stone blocks) keeps within on spreading layer, and are rammed by means of rammers. At the first stage with observance of biases the longitudinal and cross-section lay-out of a stacked surface is made for a drain of water. Further it is made ramming and tamping of surface.

Process of stacking pavement tiles.
" road brick " (stone blocks). Pavement tiles (stone blocks) keep within on spreading layer, and are rammed by means of rammers.
 
Final stage of performance of works.
On a surface of the laid tiles it is spilled dry mix and distributed on cracks. The surface laid pavement tile is cleared carefully of the rests of dry mix and pours down along cracks with a small amount of water from a watering can.
Cottage Drain with a pig-iron lattice and a pig-iron frame
Garage Drain with a pig-iron lattice and a pig-iron frame

It can be made changes to the construction which do not influence quality of production.

It can be made changes to the construction which do not influence quality of production.
The price-list of vibrocast pavement tile
 The price-list of drypressed pavement tile

|
| |